  • REQUEST FOR INFORMATION - Exploring Innovative Design and Construction Methodologies with Korean Industry
    • W912UM26Z9999-SS
    • 2026-09-11

    https://sam.gov/workspace/contract/opp/7c2c6aa5582042d79a57ca243f72a571/view


    REQUEST FOR INFORMATION - Exploring Innovative Design and Construction Methodologies with Korean Industry

    Active

    Opportunity

    Notice ID

    W912UM26Z9999

    Related Notice

    (blank)

    Contract Opportunity Type

    Sources Sought

    Contract Line Item Number

    (blank)

    Inactive Dates

    Sep 26, 2026

    Inactive Policy

    15 days after response date

    Response Date

    Sep 11, 2026 5:00 PM GMT+9

    Published Date

    Sep 02, 2026 5:41 PM GMT+9

    Department/Ind. Agency

    DEPT OF DEFENSE

    Sub-tier

    DEPT OF THE ARMY

    Major Command

    US ARMY CORPS OF ENGINEERS

    Sub Command 1, 2, 3

    ENGINEER DIVISION PACIFIC OCEAN

    ENDIST FAR EAST

    Office

    W2SN ENDIST FAR EAST

    Classification

    Original Set Aside

    (blank)

    Product Service Code

    (blank)

    NAICS Code

    23 - Construction

    Place of Performance

    (blank)

    Initiative

    None

    Description

    SPECIAL NOTICE – REQUEST FOR INFORMATION AMENDMENT 01


    USACE FED plans to hold a Reverse Industry Day on 6 October 2026. The exact time and location will be announced separately to interested companies. Information received in response to this RFI will help USACE FED prepare for the event and identify topics that will support meaningful discussions with industry in Korea.


    The Reverse Industry Day will provide an opportunity for USACE FED and Industry to openly exchange information and learn from each other regarding innovative or non-traditional acquisition and project delivery methods, as well as real-world experiences and lessons learned in improving project delivery timelines and controlling costs.


    1. Purpose


    Currently, USACE FED is looking for better ways to manage projects, improve project timelines, and control costs. To do this, we are exploring innovative and non-traditional methods such as:


    Progressive Design-Build (PDB): The project scope and price are developed in stages collaboratively between the Government and the Design-Build firm as a team. The team work closely together to define the project before setting a final price, and allows for the Design-Build firm to progress to construction, non-competitively.

    Other Transaction Authority (OTA) as a procurement method for the Government: A flexible U.S. Government contracting method that allows for faster and more innovative solutions, by reducing some standard contracting rules. Agreements resulting from OTA is legally binding instrument, other than a procurement contract, that is not subject to FAR and supplements. It enables commercial style business arrangements.

    Construction Manager at Risk (CMAR): A delivery method in which the constructor joins the design process early, collaborating with the designer to establish a guaranteed maximum price (GMP) and completes construction.

    *See supplemental information attached to this notice.


    We invite all interested companies in design, engineering, construction, architecture-engineering, and project management with relevant experience and expertise in Korea. This includes companies with strong experience in private sector or Korean Government projects. You do not need prior experience with the U.S. Government or with our acquisition procedures. We want to learn about your successful methods and how they work.


    2. Information Requested


    To help USACE FED better understand Korean industry capabilities and prepare for a meaningful and productive Reverse Industry Day on 6 October 2026, the Government has identified the questions and discussion topics below for consideration by industry.


    These questions represent areas that USACE FED may discuss with industry during the Reverse Industry Day. Interested companies are encouraged to review the questions in advance, consider how their experience and capabilities relate to these topics, and come prepared to share their perspectives, experiences, lessons learned, and recommendations during the event.


    Companies are not required to provide written responses to every question. The intent is to provide industry with advance visibility into the Government's areas of interest and allow participants sufficient time to prepare for a meaningful Government-industry exchange.


    Company Details


    Company name, address, and website.

    Main point of contact (name, title, email, and phone number).

    Provide a brief description of your company's primary business areas, capabilities, and specialized expertise.

    How many years has your company been involved in design and/or construction?

    Has your company previously performed work for the U.S. Government? Prior U.S. Government experience is not required.

    Describe your company's capability and experience in delivering large or complex design and construction projects in Korea.

    Experience with Innovative Project Delivery Methods


    Does your company have experience with any of the following methods or similar Korean commercial or government practices?

    Design-Build (DB)

    Progressive Design-Build (PDB)

    Construction Manager at Risk (CMAR)

    Other Transaction Authority (OTA) agreements or similar flexible contracting approaches

    Other innovative, collaborative, or accelerated project delivery methods used in Korea

    If applicable, please briefly describe your experience, including examples of projects where these approaches were successfully used.

    Industrialized Construction Methodologies


    USACE FED is interested in understanding Korean industry's capabilities and experience with industrialized, modular, prefabricated, and other innovative construction methodologies.


    Please describe your company's capabilities and experience with any of the following:

    Volumetric modular construction;

    Prefabricated building components or systems manufactured off-site and assembled on-site;

    Pre-Engineered Metal Buildings (PEMB);

    Tension Fabric Structures;

    Additive manufacturing (3D printing) for construction; and

    Other innovative or industrialized construction methodologies.

    Please describe your company's experience or capability to provide:

    Maintenance facilities using Pre-Engineered Metal Buildings;

    Aircraft hangars using Tension Fabric Structures; and

    Barracks, child development centers, kennels, or other repeatable facility types using volumetric modular construction, prefabricated components, 3D printing, or similar methods.

    What other construction capabilities or methodologies could provide greater flexibility or strategic agility by allowing facilities to be expanded, repurposed, relocated, or otherwise adapted as mission requirements change? Please identify the types of facilities for which these approaches may be suitable.

    To what extent are the materials, components, equipment, and specialized labor necessary for these construction methodologies available in Korea?

    If your company has completed projects using these methodologies, please describe the results, including, as applicable:

    Schedule or time savings;

    Cost benefits;

    Quality and performance;

    Customer satisfaction;

    Challenges encountered and lessons learned; and

    Any limitations or circumstances in which the methodology may not be appropriate.

    Korean Best Practices


    Based on your experience, what design, construction, acquisition, or project delivery practices have been particularly successful in Korea that USACE FED should consider for future projects? Please explain why these practices have been successful.

    Are there U.S. Government requirements, processes, or practices that you believe could create challenges or barriers to implementing these approaches? If so, please identify the potential challenges and suggest possible alternatives or approaches that USACE FED should consider.

    3. Industry Questions, Concerns, and Suggested Discussion Topics


    In addition to considering the Government's questions above, USACE FED encourages companies to identify and submit their own questions, concerns, challenges, recommendations, or suggested topics for discussion prior to the Reverse Industry Day.


    USACE FED is particularly interested in industry's perspectives regarding innovative or non-traditional contracting and project delivery methods, including any challenges that may affect their successful implementation in Korea.


    Industry questions and feedback may address topics such as:


    Challenges or barriers associated with U.S. Government acquisition, design, or construction processes;

    Questions or concerns regarding innovative or non-traditional contracting and project delivery methods;

    Differences between Korean commercial or Government practices and U.S. Government practices that may affect implementation;

    Barriers Korean companies may encounter when participating in U.S. Government projects;

    Opportunities to improve communication, collaboration, and early industry involvement;

    Recommendations for improving project delivery timelines, cost control, quality, flexibility, or efficiency;

    Recommendations for adapting successful Korean industry practices for use on U.S. Government projects; and

    Any other questions, concerns, or topics that industry believes would contribute to a productive discussion.

    Companies are highly encouraged to submit any questions, concerns, or suggested discussion topics in advance, particularly those for which they would like to receive a Government response or clarification during the Reverse Industry Day.


    Submission Deadline: 11 September 2026, at 5:00 PM Korean Standard Time (KST).


    USACE FED will consider the information received in developing the event agenda and discussion topics and, as appropriate, will address industry questions and concerns during the Reverse Industry Day.


    The Government's questions identified in this notice are intended to serve as discussion points and areas of interest rather than a formal questionnaire. Industry participants are encouraged to review these topics before the event and come prepared to discuss relevant capabilities, successful projects, lessons learned, potential challenges, and recommendations.


    The overall objective is to promote an open and meaningful exchange between USACE FED and Korean industry and to identify innovative contracting, project delivery, design, and construction approaches that may improve the delivery of future USACE FED projects.


    4. Contact Information


    Please submit your response to the following email address:


    CT-BOBranch@usace.army.mil


    Contact Information

    Primary Point of Contact

    Sonya Sharp

    Email

    sonya.s.sharp@usace.army.mil

    Phone Number

    3157556457

    Alternative Point of Contact

    Jennifer Knutson

    Email

    jennifer.h.knutson@usace.army.mil

    Phone Number

    (blank)

    Contracting Office Address

    HQ USACE FED CAMP HUMPHREYS

    UNIT 15546

    APO, AP 96271-0000 USA

    Attachments/Links

    Links

    No links have been added to this opportunity.

    Attachments

    Download All

    Request Access

    Document File Size Access Updated Date

    PDB-OTA Process Overview Placemat.pdf

    331.27 KB Public Aug 27, 2026

    Playbook - Executing PDB with OTA.pdf

    1.31 MB Public Aug 27, 2026

    Placemat Design Build to Budget.pptx

    1.99 MB Public Aug 27, 2026